Triad Engineering, Inc 1994, Phase 1 through 3 Feasibility Study
Triad Engineering, Inc 1994, Phase 1 through 3 Feasibility Study
Samples that cite this reference
Lab number | Site | Province / State | Normalized age | δ13C (per mil) |
---|---|---|---|---|
Beta-28861 | 15LA222 (Graham) | KY | ||
Beta-3095 | 15LA222 (Graham) | KY |